Project Planning and Controlling

Wednesday December 15, 2021

“Please select any project from your side with in UAE 1- prepare s SOW ( statement of work ) 2-prepare a WBS ( work break down structure ) 3-prepare a LRC ( linear responsibility chart ) PROJECT STATEMENT OF WORK (SOW)  INTRODUCTION The main aim of this project is to construct a high-quality, custom home within five months at cost not to exceed $150,000.  TECHNICAL DESCRIPTION 1. Home must meet local building codes. 2. All windows and doors must pass NFRC class 40 energy ratings. 3. Exterior wall insulation must meet an “A” factor of 21. 4. Ceiling insulation must meet an “R” factor of 38. 5. Floor insulation must meet an “R” factor of 25. 6. Garage will accommodate two large-size cars and one 20-foot Winnebago. 7. Structure must pass seismic stability codes.  TIMELINE / MILESTONES 1. Permits approved—March 5 2. Foundation poured—March 14 3. Dry in. Framing, sheathing, plumbing, electrical, and mechanical inspections passed—May 25 4. Final inspection—June 7  LIMITS AND EXCLUSIONS 1. The home will be built to the specifications and design of the original blueprints provided by the customer. 2. Owner responsible for landscaping. 3. Refrigerator is not included among kitchen appliances. 4. Air conditioning is not included but prewiring is included. 5. Contractor reserves the right to contract out services. 6. Contractor responsible for subcontracted work. 7. Site work limited to Monday through Friday, 8:00 A.M. to 6:00 P.M.  CLIENT EXPECTATIONS: DELIVERABLES • A 2,200-square-foot, 2½-bath, 3-bedroom, finished home. • A finished garage, insulated and sheetrocked. • Kitchen appliances to include range, oven, microwave, and dishwasher. • High-efficiency gas furnace with programmable thermosta


Get a custom answer for this and any question related to academic

Order Now
Order a Custom Paper
By placing an order, you agree to our terms & conditions
×

Powered by WhatsApp Chat

× How can I help you?